Skip to content
Contact Us

2022 Connecticut Electric Vehicle Charging Station Incentives

 

Electric Vehicle (EV) Charging Station Incentives: Connecticut

 

New incentives will encourage investments in zero emission vehicle infrastructure, and additional incentives for underserved communities

Connecticut’s Public Utilities Regulatory Authority (PURA) today issued a final decision as part of its Equitable Modern Grid initiative that establishes a nine-year program to support the installation of electric vehicle charging infrastructure across the state, focusing on equity and inclusion

 

Quick Overview

This Electric Vehicle (EV) Charging Program provides a combination of incentives for infrastructure — including electric vehicle supply equipment (EVSE) and fast charging stations.

The Connecticut Light and Power Company d/b/a Eversource Energy (Eversource) and The United Illuminating Company (UI) will administer the program beginning January 1, 2022. 

Energy consultants like Titan Energy can help organizations navigate this process.

 

Market Segments for New Incentive Program

The EV Charging Program will offer incentives for the deployment of EVSE in five program areas, or market segments:

  1. Residential Single-Family Level 2 Charging;
  2. Residential Multi-Unit Dwellings (MUDs) Level 2 Charging;
  3. Direct current fast charging (DCFC);
  4. Destination Level 2 Charging; and
  5. Workplace & Light-Duty Fleet Level 2 Charging.

Specifically, the Decision directs Eversource and UI to offer the following incentives for both EVSE (i.e., chargers) and any associated electrical upgrades:

2022-CT-Incentive-IMAGE-3
 

Difference between Level 1, Level 2 and Level 3 Charging

You may be asking, how long does it take to charge an electric vehicle? This chart can help answer this question.

EV-Charging-Levels-Photos-300x300-1

Level 1 Charging

  •  120 VAC standard outlet
  •  Delivers power from the wall to the vehicle’s on-board charger
  •  Time from fully depleted to fully charged: average 7-29+ hours
  •  Typically provided with your Electric Vehicle
EV-Charging-Levels-Photos-1-300x300-1

Level 2 Charging

  •  208-240 VAC installation
  •  Delivers AC power from the wall to the on-board charger
  •  Time from fully depleted to fully charged: average 2-10+ hours depending on vehicle
EV-Charging-Levels-Photos-2-300x300-1

Level 3 Charging

Direct current fast charging (DCFC)
  •  400-600 VAC installation
  •  Delivers DC energy bypassing the on-board charger
  •  Time from fully depleted to fully charged in about 30 minutes
 

Read On